Project planning / Marble racing

Aurora Rally
Brand customisation

A planning brief for a one-time licence · platform planning · sandbox validation.

Your project scenario

Six marbles race over three laps in a luminous arena. Pick a contender and watch the race unfold.

Aurora Rally combines race progress and contender selection with a marble racing concept. For platform planning, the brand customisation work should be evaluated during sandbox validation before the scope of the one-time licence is accepted.

Run the integration tests in the isolated test environment. Public demo credits and test-wallet credits are separate systems.

Aurora Rally concept artworkPlayable concept

Explore Aurora Rally ↗

Marble racing · Virtual-credit demo

Integration priority

Brand customisation

Document the brand assets, interface language, animation style and sound requirements before asking for a reskin.

Review visual assets at real display sizes and check that text and controls remain readable during play.

Commercial scope

One-time licence

Define a right to use the agreed build, with the brands, domains and delivery scope written down. A one-time payment does not automatically transfer ownership.

Specify whether maintenance is included or separately renewed.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Race progress and contender selection

Specify when contender selection locks and how the authoritative result would be represented. Keep the race animation consistent with the approved result model.

Acceptance checklist

CheckEvidence to collect
01 / Record font and artwork usage rightsRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
02 / Review long labels and localisation expansionRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
03 / Check contrast and control visibilityRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
04 / Agree sign-off on the first playable buildRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
05 / Select each of the six contendersRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
06 / Review lap progressionRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
07 / Check the winner presentationRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.

Agreement review

  • Permitted usage
  • Delivered version
  • Maintenance responsibility

For this Aurora Rally proposal, connect each agreed right to an identifiable deliverable. Keep brand customisation changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Aurora Rally evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0303. Requirements must be confirmed against your actual platform and agreement.