Project planning / Marble racing

Aurora Rally
Game launch integration

A planning brief for a exclusive project · platform planning · prototype review.

Your project scenario

Six marbles race over three laps in a luminous arena. Pick a contender and watch the race unfold.

Aurora Rally combines race progress and contender selection with a marble racing concept. For platform planning, the game launch integration work should be evaluated during prototype review before the scope of the exclusive project is accepted.

Play the concept with representative users from your team and record the difference between preference changes and defects.

Aurora Rally concept artworkPlayable concept

Explore Aurora Rally ↗

Marble racing · Virtual-credit demo

Integration priority

Game launch integration

Define who requests the launch, how the player reaches the game and which exact hostnames may embed it. API secrets stay on the operator server.

Test valid and expired launches, suspended licences, unauthorised games and unapproved subdomains.

Commercial scope

Exclusive project

Define the exact scope of exclusivity: game, artwork, brand, territory or channel. Exclusivity has value only when its boundaries are explicit.

Confirm ownership of third-party assets and define what may be reused.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Race progress and contender selection

Specify when contender selection locks and how the authoritative result would be represented. Keep the race animation consistent with the approved result model.

Acceptance checklist

CheckEvidence to collect
01 / Request a launch for an allowed gameRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
02 / Attempt a launch after licence expiryRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
03 / Check a hostname outside the agreementRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
04 / Confirm credential revocation blocks new requestsRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
05 / Select each of the six contendersRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
06 / Review lap progressionRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
07 / Check the winner presentationRecord the Aurora Rally build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.

Agreement review

  • Scope of exclusivity
  • Asset ownership
  • Reuse restrictions

For this Aurora Rally proposal, connect each agreed right to an identifiable deliverable. Keep game launch integration changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Aurora Rally evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0168. Requirements must be confirmed against your actual platform and agreement.