Project planning / Physics drop

Boss Drop
Brand customisation

A planning brief for a custom build · platform planning · discovery.

Your project scenario

A suited boss tumbles through a cinematic city, colliding with obstacles, collecting coins and landing in payout lanes.

Boss Drop combines object collisions and landing behaviour with a physics drop concept. For platform planning, the brand customisation work should be evaluated during discovery before the scope of the custom build is accepted.

Produce a written requirements list and identify missing information before quoting implementation work.

Boss Drop concept artworkPlayable concept

Explore Boss Drop ↗

Physics drop · Virtual-credit demo

Integration priority

Brand customisation

Document the brand assets, interface language, animation style and sound requirements before asking for a reskin.

Review visual assets at real display sizes and check that text and controls remain readable during play.

Commercial scope

Custom build

Agree a commissioned production against a specific brief, review milestones and acceptance criteria. Decide which work begins only after the concept is approved.

Map requested changes to the build and record acceptance evidence.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Object collisions and landing behaviour

Agree whether the physics is visual presentation or part of the outcome model. A commercial game must prevent client-side manipulation from deciding real payouts.

Acceptance checklist

CheckEvidence to collect
01 / Record font and artwork usage rightsRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
02 / Review long labels and localisation expansionRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
03 / Check contrast and control visibilityRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
04 / Agree sign-off on the first playable buildRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
05 / Observe collisions with obstaclesRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
06 / Review landing-lane presentationRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
07 / Check coin feedback during a fallRecord the Boss Drop build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.

Agreement review

  • Deliverables
  • Review milestones
  • Acceptance criteria

For this Boss Drop proposal, connect each agreed right to an identifiable deliverable. Keep brand customisation changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Boss Drop evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0085. Requirements must be confirmed against your actual platform and agreement.