Project planning / Coin pusher

Coral Treasury
Technical evaluation

A planning brief for a custom build · platform planning · handover planning.

Your project scenario

An underwater treasury gives the familiar coin-pusher mechanic an atmospheric ocean world and a fresh visual identity.

Coral Treasury combines coin movement and pushing with a coin pusher concept. For platform planning, the technical evaluation work should be evaluated during handover planning before the scope of the custom build is accepted.

Define documentation, account ownership, secret rotation, support contacts and the acceptance record required for handover.

Coral Treasury concept artworkPlayable concept

Explore Coral Treasury ↗

Coin pusher · Virtual-credit demo

Integration priority

Technical evaluation

Evaluate the current concept against the requirements of your platform. Separate demonstrated features from changes that still require production work.

Record reproducible steps, expected outcomes and device details for each issue; retest the specific affected behaviour after a fix.

Commercial scope

Custom build

Agree a commissioned production against a specific brief, review milestones and acceptance criteria. Decide which work begins only after the concept is approved.

Map requested changes to the build and record acceptance evidence.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Coin movement and pushing

Define how simulated coin movement relates to any future monetary result. Do not derive real payouts from an untrusted browser simulation.

Acceptance checklist

CheckEvidence to collect
01 / List requirements absent from the conceptRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
02 / Check initial loading and asset failuresRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
03 / Exercise a complete demo roundRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
04 / Record recovery after navigation or refreshRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
05 / Observe overlapping coin motionRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
06 / Check the push action and visual responseRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
07 / Review the end-of-round stateRecord the Coral Treasury build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.

Agreement review

  • Deliverables
  • Review milestones
  • Acceptance criteria

For this Coral Treasury proposal, connect each agreed right to an identifiable deliverable. Keep technical evaluation changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Coral Treasury evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0597. Requirements must be confirmed against your actual platform and agreement.