Project planning / Prize wheel

Jade Fortune
Game launch integration

A planning brief for a annual licence · multi-brand operation · handover planning.

Your project scenario

A gold-and-jade prize wheel combines twelve sectors with classic and bold play modes in a polished visual setting.

Jade Fortune combines wheel sectors and risk mode with a prize wheel concept. For multi-brand operation, the game launch integration work should be evaluated during handover planning before the scope of the annual licence is accepted.

Define documentation, account ownership, secret rotation, support contacts and the acceptance record required for handover.

Jade Fortune concept artworkPlayable concept

Explore Jade Fortune ↗

Prize wheel · Virtual-credit demo

Integration priority

Game launch integration

Define who requests the launch, how the player reaches the game and which exact hostnames may embed it. API secrets stay on the operator server.

Test valid and expired launches, suspended licences, unauthorised games and unapproved subdomains.

Commercial scope

Annual licence

Define a recurring annual access period and what happens at renewal or expiry. Separate the software right from hosting and operational services.

Set the agreed end date and test access after it passes.

Channel requirements

Multi-brand operation

Separate each brand’s approved hostnames, catalogue access and operational contacts. Test that one customer or brand cannot obtain another customer’s credentials or sessions.

Game-specific decision

Wheel sectors and risk mode

Agree sector weights and mode-specific probabilities before describing an RTP or maximum win. The twelve visible sectors alone do not establish payout maths.

Acceptance checklist

CheckEvidence to collect
01 / Request a launch for an allowed gameRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
02 / Attempt a launch after licence expiryRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
03 / Check a hostname outside the agreementRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
04 / Confirm credential revocation blocks new requestsRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
05 / Review all twelve visible sectorsRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
06 / Switch classic and bold modesRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
07 / Check wheel-stop and result alignmentRecord the Jade Fortune build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.

Agreement review

  • Annual term
  • Renewal decision
  • End-of-term access

For this Jade Fortune proposal, connect each agreed right to an identifiable deliverable. Keep game launch integration changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Jade Fortune evaluation. Start with the checklist above, then add partner-specific cases.

42 planned test executions.

Planning reference GQX-4284. Requirements must be confirmed against your actual platform and agreement.