Project planning / Rocket crash

Orbital Run
Brand customisation

A planning brief for a annual licence · multi-brand operation · commercial scoping.

Your project scenario

A rocket climbs towards orbit as its multiplier rises. Choose when to cash out before the flight ends.

Orbital Run combines cash-out timing and flight end with a rocket crash concept. For multi-brand operation, the brand customisation work should be evaluated during commercial scoping before the scope of the annual licence is accepted.

Turn the evaluation into deliverables, ownership terms, acceptance evidence and a responsibility matrix.

Orbital Run concept artworkPlayable concept

Explore Orbital Run ↗

Rocket crash · Virtual-credit demo

Integration priority

Brand customisation

Document the brand assets, interface language, animation style and sound requirements before asking for a reskin.

Review visual assets at real display sizes and check that text and controls remain readable during play.

Commercial scope

Annual licence

Define a recurring annual access period and what happens at renewal or expiry. Separate the software right from hosting and operational services.

Set the agreed end date and test access after it passes.

Channel requirements

Multi-brand operation

Separate each brand’s approved hostnames, catalogue access and operational contacts. Test that one customer or brand cannot obtain another customer’s credentials or sessions.

Game-specific decision

Cash-out timing and flight end

A live crash game needs an authoritative cash-out acceptance rule and settlement timing. Network delay must not let the browser decide whether a real bet won.

Acceptance checklist

CheckEvidence to collect
01 / Record font and artwork usage rightsRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.
02 / Review long labels and localisation expansionRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.
03 / Check contrast and control visibilityRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.
04 / Agree sign-off on the first playable buildRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.
05 / Use manual cash-out during ascentRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.
06 / Check the state after flight endRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.
07 / Review multiplier readabilityRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing commercial scoping.

Agreement review

  • Annual term
  • Renewal decision
  • End-of-term access

For this Orbital Run proposal, connect each agreed right to an identifiable deliverable. Keep brand customisation changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Orbital Run evaluation. Start with the checklist above, then add partner-specific cases.

42 planned test executions.

Planning reference GQX-4185. Requirements must be confirmed against your actual platform and agreement.