Project planning / Rocket crash

Orbital Run
Brand customisation

A planning brief for a custom build · platform planning · sandbox validation.

Your project scenario

A rocket climbs towards orbit as its multiplier rises. Choose when to cash out before the flight ends.

Orbital Run combines cash-out timing and flight end with a rocket crash concept. For platform planning, the brand customisation work should be evaluated during sandbox validation before the scope of the custom build is accepted.

Run the integration tests in the isolated test environment. Public demo credits and test-wallet credits are separate systems.

Orbital Run concept artworkPlayable concept

Explore Orbital Run ↗

Rocket crash · Virtual-credit demo

Integration priority

Brand customisation

Document the brand assets, interface language, animation style and sound requirements before asking for a reskin.

Review visual assets at real display sizes and check that text and controls remain readable during play.

Commercial scope

Custom build

Agree a commissioned production against a specific brief, review milestones and acceptance criteria. Decide which work begins only after the concept is approved.

Map requested changes to the build and record acceptance evidence.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Cash-out timing and flight end

A live crash game needs an authoritative cash-out acceptance rule and settlement timing. Network delay must not let the browser decide whether a real bet won.

Acceptance checklist

CheckEvidence to collect
01 / Record font and artwork usage rightsRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
02 / Review long labels and localisation expansionRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
03 / Check contrast and control visibilityRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
04 / Agree sign-off on the first playable buildRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
05 / Use manual cash-out during ascentRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
06 / Check the state after flight endRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.
07 / Review multiplier readabilityRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing sandbox validation.

Agreement review

  • Deliverables
  • Review milestones
  • Acceptance criteria

For this Orbital Run proposal, connect each agreed right to an identifiable deliverable. Keep brand customisation changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Orbital Run evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0325. Requirements must be confirmed against your actual platform and agreement.