Project planning / Rocket crash

Orbital Run
Game launch integration

A planning brief for a annual licence · platform planning · prototype review.

Your project scenario

A rocket climbs towards orbit as its multiplier rises. Choose when to cash out before the flight ends.

Orbital Run combines cash-out timing and flight end with a rocket crash concept. For platform planning, the game launch integration work should be evaluated during prototype review before the scope of the annual licence is accepted.

Play the concept with representative users from your team and record the difference between preference changes and defects.

Orbital Run concept artworkPlayable concept

Explore Orbital Run ↗

Rocket crash · Virtual-credit demo

Integration priority

Game launch integration

Define who requests the launch, how the player reaches the game and which exact hostnames may embed it. API secrets stay on the operator server.

Test valid and expired launches, suspended licences, unauthorised games and unapproved subdomains.

Commercial scope

Annual licence

Define a recurring annual access period and what happens at renewal or expiry. Separate the software right from hosting and operational services.

Set the agreed end date and test access after it passes.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Cash-out timing and flight end

A live crash game needs an authoritative cash-out acceptance rule and settlement timing. Network delay must not let the browser decide whether a real bet won.

Acceptance checklist

CheckEvidence to collect
01 / Request a launch for an allowed gameRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
02 / Attempt a launch after licence expiryRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
03 / Check a hostname outside the agreementRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
04 / Confirm credential revocation blocks new requestsRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
05 / Use manual cash-out during ascentRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
06 / Check the state after flight endRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.
07 / Review multiplier readabilityRecord the Orbital Run build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing prototype review.

Agreement review

  • Annual term
  • Renewal decision
  • End-of-term access

For this Orbital Run proposal, connect each agreed right to an identifiable deliverable. Keep game launch integration changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Orbital Run evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0160. Requirements must be confirmed against your actual platform and agreement.