Project planning / Rocket crash

Orbital Run
Game launch integration

A planning brief for a custom build · multi-brand operation · handover planning.

Your project scenario

A rocket climbs towards orbit as its multiplier rises. Choose when to cash out before the flight ends.

Orbital Run combines cash-out timing and flight end with a rocket crash concept. For multi-brand operation, the game launch integration work should be evaluated during handover planning before the scope of the custom build is accepted.

Define documentation, account ownership, secret rotation, support contacts and the acceptance record required for handover.

Orbital Run concept artworkPlayable concept

Explore Orbital Run ↗

Rocket crash · Virtual-credit demo

Integration priority

Game launch integration

Define who requests the launch, how the player reaches the game and which exact hostnames may embed it. API secrets stay on the operator server.

Test valid and expired launches, suspended licences, unauthorised games and unapproved subdomains.

Commercial scope

Custom build

Agree a commissioned production against a specific brief, review milestones and acceptance criteria. Decide which work begins only after the concept is approved.

Map requested changes to the build and record acceptance evidence.

Channel requirements

Multi-brand operation

Separate each brand’s approved hostnames, catalogue access and operational contacts. Test that one customer or brand cannot obtain another customer’s credentials or sessions.

Game-specific decision

Cash-out timing and flight end

A live crash game needs an authoritative cash-out acceptance rule and settlement timing. Network delay must not let the browser decide whether a real bet won.

Acceptance checklist

CheckEvidence to collect
01 / Request a launch for an allowed gameRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
02 / Attempt a launch after licence expiryRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
03 / Check a hostname outside the agreementRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
04 / Confirm credential revocation blocks new requestsRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
05 / Use manual cash-out during ascentRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
06 / Check the state after flight endRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
07 / Review multiplier readabilityRecord the Orbital Run build, multi-brand operation environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.

Agreement review

  • Deliverables
  • Review milestones
  • Acceptance criteria

For this Orbital Run proposal, connect each agreed right to an identifiable deliverable. Keep game launch integration changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Orbital Run evaluation. Start with the checklist above, then add partner-specific cases.

42 planned test executions.

Planning reference GQX-4300. Requirements must be confirmed against your actual platform and agreement.