Project planning / Premium cinematic slot

Solar Vault
Licence operations

A planning brief for a custom build · aggregator review · handover planning.

Your project scenario

A cinematic five-reel slot with winning cascades, reactor wilds, vault free spins and original action sounds. Customise your edition in Game Studio.

Solar Vault combines cascades and reactor wilds with a premium cinematic slot concept. For aggregator review, the licence operations work should be evaluated during handover planning before the scope of the custom build is accepted.

Define documentation, account ownership, secret rotation, support contacts and the acceptance record required for handover.

Solar Vault concept artworkPlayable concept

Explore Solar Vault ↗

Premium cinematic slot · Virtual-credit demo

Integration priority

Licence operations

Translate the commercial agreement into a specific catalogue, approved hostnames, expiry rules and support responsibilities.

Check activation, expiration, suspension and key rotation using test accounts before handing access to the customer.

Commercial scope

Custom build

Agree a commissioned production against a specific brief, review milestones and acceptance criteria. Decide which work begins only after the concept is approved.

Map requested changes to the build and record acceptance evidence.

Channel requirements

Aggregator review

Obtain the partner’s real integration specification first. Catalogue identifiers, launch fields and wallet semantics must be mapped to that specification; no named aggregator connector is implied.

Game-specific decision

Cascades and reactor wilds

Three winning cascades charge the reactor; initial vault keys trigger free spins. Customer presentation settings do not change the mathematical model.

Acceptance checklist

CheckEvidence to collect
01 / Confirm the permitted game identifiersRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
02 / Compare approved hostnames with the agreementRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
03 / Revoke an unused integration credentialRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
04 / Test account separation and access after suspensionRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
05 / Check autoplay stop and loss limitsRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
06 / Verify event-synchronised action soundsRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.
07 / Verify customer edition isolationRecord the Solar Vault build, aggregator review environment, expected result and observed result. Attach reproducible steps for any mismatch before completing handover planning.

Agreement review

  • Deliverables
  • Review milestones
  • Acceptance criteria

For this Solar Vault proposal, connect each agreed right to an identifiable deliverable. Keep licence operations changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Solar Vault evaluation. Start with the checklist above, then add partner-specific cases.

35 planned test executions.

Planning reference GQX-0750. Requirements must be confirmed against your actual platform and agreement.