Project planning / Premium cinematic slot

Solar Vault
Licence operations

A planning brief for a exclusive project · platform planning · discovery.

Your project scenario

A cinematic five-reel slot with winning cascades, reactor wilds, vault free spins and original action sounds. Customise your edition in Game Studio.

Solar Vault combines cascades and reactor wilds with a premium cinematic slot concept. For platform planning, the licence operations work should be evaluated during discovery before the scope of the exclusive project is accepted.

Produce a written requirements list and identify missing information before quoting implementation work.

Solar Vault concept artworkPlayable concept

Explore Solar Vault ↗

Premium cinematic slot · Virtual-credit demo

Integration priority

Licence operations

Translate the commercial agreement into a specific catalogue, approved hostnames, expiry rules and support responsibilities.

Check activation, expiration, suspension and key rotation using test accounts before handing access to the customer.

Commercial scope

Exclusive project

Define the exact scope of exclusivity: game, artwork, brand, territory or channel. Exclusivity has value only when its boundaries are explicit.

Confirm ownership of third-party assets and define what may be reused.

Channel requirements

Platform planning

Start with the operator’s actual browser, wallet and player journey requirements. This brief is a planning scenario, not a claim of compatibility with an unnamed casino.

Game-specific decision

Cascades and reactor wilds

Three winning cascades charge the reactor; initial vault keys trigger free spins. Customer presentation settings do not change the mathematical model.

Acceptance checklist

CheckEvidence to collect
01 / Confirm the permitted game identifiersRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
02 / Compare approved hostnames with the agreementRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
03 / Revoke an unused integration credentialRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
04 / Test account separation and access after suspensionRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
05 / Check autoplay stop and loss limitsRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
06 / Verify event-synchronised action soundsRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.
07 / Verify customer edition isolationRecord the Solar Vault build, platform planning environment, expected result and observed result. Attach reproducible steps for any mismatch before completing discovery.

Agreement review

  • Scope of exclusivity
  • Asset ownership
  • Reuse restrictions

For this Solar Vault proposal, connect each agreed right to an identifiable deliverable. Keep licence operations changes explicit in the statement of work.

Scope boundary

The current game is a playable concept. Test wallet behaviour is available separately in the developer sandbox. Real-money wagering is disabled in that sandbox.

A live build requires server-authoritative gameplay, validated payout maths, partner-specific wallet integration and applicable testing. This brief is a planning aid, not evidence of certification or an existing platform connector.

Plan the test workload

Adjust the environments and test cases for this Solar Vault evaluation. Start with the checklist above, then add partner-specific cases.

21 planned test executions.

Planning reference GQX-0024. Requirements must be confirmed against your actual platform and agreement.